Diagram of Method Statement
BF·01

Crack Stitching

Method Statement
  1. Cut a slot into horizontal mortar joint using a wall chaser
  2. Clean slot with vacuum and thoroughly flush with water
  3. Insert a bead of Bond Flex into the back of the slot using a Bond Flex gun kit
  4. Push the Bar Flex into the Bond Flex at the back of the slot
  5. Insert a bead of Bond Flex over the exposed Bar Flex and iron into the slot using a finger trowel
  6. Point or fill the joint and leave ready for any decoration.
  7. Repeat 1-6 for other required stitches
Guidelines
  • Depth of slot is between 25 mm and 35 mm.
  • Bar Flex to be installed a minimum of 500 mm each side of the crack.
  • Vertical spacing of crack stitches is 450 mm (6 brick courses).
  • Where a crack is within 500 mm of the end of a wall, continue Bar Flex for at least 100 mm around the corner and fix into the adjoining wall.
  • Where a crack is within 500 mm of an opening, bend Bar Flex back and fix into the reveal.